|
|
  
Timber based floor
Resistances
| Part No |
Coverage (M²) |
Normal |
Minimum -4% |
Maximum +9% |
| eMat 100-0.5 |
0.5m |
1058 |
1016 |
1153 |
| eMat 100-1 |
1.0m |
529 |
507.8 |
576.6 |
| eMat 100-1.5 |
1.5m |
353 |
338.9 |
384.8 |
| eMat 100-2 |
2.0m |
265 |
254.4 |
288.9 |
| eMat 100-2.5 |
2.5m |
212 |
203.5 |
231.1 |
| eMat 100-3 |
3.0m |
176 |
169 |
191.8 |
| eMat 100-3.5 |
3.5m |
151 |
145 |
164.6 |
| eMat 100-4 |
4.0m |
132 |
126.7 |
143.9 |
| eMat 100-5 |
5.0m |
106 |
101.8 |
115.5 |
| eMat 100-6 |
6.0m |
88.2 |
84.67 |
96.14 |
| eMat 100-7 |
7.0m |
75.6 |
72.58 |
82.4 |
| eMat 100-8 |
8.0m |
66.1 |
63.46 |
72.05 |
| eMat 100-9 |
9.0m |
58.8 |
56.45 |
64.09 |
| eMat 100-10 |
10.0m |
52.9 |
50.78 |
57.66 |
| eMat 100-12 |
12.0m |
44.1 |
42.34 |
48.07 |
  
Concrete based floor
| Part No |
Coverage (M²) |
Normal |
Minimum -4% |
Maximum +9% |
| eMat 150-0.5 |
0.5m |
705 |
676,8 |
768.5 |
| eMat 150-1 |
1.0m |
353 |
338,9 |
384.8 |
| eMat 150-1.5 |
1.5m |
235 |
225,6 |
256.2 |
| eMat 150-2 |
2.0m |
176 |
169 |
191.8 |
| eMat 150-2.5 |
2.5m |
141 |
135,4 |
153.7 |
| eMat 150-3 |
3.0m |
118 |
113,3 |
128.6 |
| eMat 150-3.5 |
3.5m |
101 |
96,96 |
110.1 |
| eMat 150-4 |
4.0m |
82.2 |
84,67 |
96.14 |
| eMat 150-5 |
5.0m |
70.5 |
67,68 |
76.85 |
| eMat 150-6 |
6.0m |
58.8 |
56,45 |
64.09 |
| eMat 150-7 |
7.0m |
50.4 |
48.38 |
54.94 |
| eMat 150-8 |
8.0m |
44.1 |
42.34 |
48.07 |
| eMat 150-9 |
9.0m |
39.2 |
37.63 |
42.73 |
| eMat 150-10 |
10.0m |
35.3 |
33.89 |
38.48 |
| eMat 150-12 |
12.0m |
29.4 |
28.22 |
32.05 |
|