|
Steps 5, 6 and 7 When you
have reached the end of the eMat Pro run carefully cut the grey backing mat in
between two yellow cables (do not cut the yellow cable) and turn the eMat Pro to
its new position. Ensuring the cable remains a minimum of 50mm apart.
Once the eMat Pro is turned and secured, continue this
process until all of your eMat Pro is used. Then check the complete matting area
is securely fixed to the floor.
Note
In some instances it may be necessary to remove the yellow
cable from the grey backing mat. If required ensure the heating cables are laid
at a minimum of 50mm apart and securely positioned on to your floor surface
using the excess grey self adhesive mat. Ensure the cables are not laid in areas
where fixed appliance may be positioned e.g. underneath sink basins or toilet
pans.
Check the resistance of the eMat Pro to ensure damage has not
occurred during the installation process. |